Skip to main content
돌아가기: 도구

엔지니어링 도구 · 정수 및 폐수 정화

침전지 설계

침전지 형상, 표면 부하와 월류 부하, 체류시간, 1개 조 정지 운전을 검토합니다.

상태
사용 가능
PROJECT · OPTIONAL

Project metadata

Report context for exports; it does not change calculations.Edit detailsHide details

01 · USER INPUT

Design basis and inputs

Engineering calculations run locally in this browser after assets load.

02 · CALCULATED RESULT

Results at a glance

Load or enter inputs, then calculate to create an authoritative result.

03 · REPORTING

Exports and verification

CSV contains input and output detail. PDF uses the current calculation and report metadata.

Verification suite

Calculation revision 256b18f5

85 focused fixtures: focused engineering fixtures for geometry, operating cases, criteria, optional inputs, independent hand-calculated cases, finite-result boundaries, result presentation, and active-input export behavior. Tests are deterministic and run without network access.

이 엔지니어링 도구는 현재 영어로만 제공됩니다.

01

엔지니어링 근거

방법론

선택한 조 형상과 활성 조 개수로 면적, 표면부하, 체류시간, 월류부하, 선택적 고형물 부하 및 1개 조 정지 조건을 계산합니다. 형상과 기준은 사용자 입력이며 침전/제거 성능이나 규제 준수 여부를 예측하지 않습니다.

Basin plan area uses only the selected geometry: length × width, pi × diameter squared / 4, or the entered area.

Surface overflow rate = design flow / active plan area. Volume = active area × side-water depth; detention time = volume / design flow.

Weir loading = design flow / active weir length. One-unit-out calculations use N - 1 identical basins and their remaining weir length.

Solids loading = the entered plant solids mass flow / active plan area. The same plant solids mass flow is distributed across the remaining active area for the one-unit-out case.

범위 / 제한사항

  • 유량, 수심, 월류 조건과 선택적 사용자 기준을 바탕으로 직사각형·원형 또는 직접 입력한 조 면적을 비교하고 N−1 경고를 명시합니다.
  • This screening calculation does not perform CFD, predict settling or particle removal, or guarantee treatment performance.
  • It does not provide structural, mechanical, scraper, or detailed clarifier design.
  • Criterion comparisons use user-entered values and do not determine code or regulatory compliance.
02

엔지니어링 경로

정수 처리 경로

폐수 처리 경로