방법론
명시된 프로젝트 및 제조사 자료로 유량 조건, 수로 수리, 스크린·침사 제거 설비의 정격 용량, 예비 용량, 선택적 협잡물·침사 처리를 검토합니다.
엔지니어링 도구 · 수처리
명시된 프로젝트 및 제조사 자료로 유량 조건, 수로 수리, 스크린·침사 제거 설비의 정격 용량, 예비 용량, 선택적 협잡물·침사 처리를 검토합니다.
01 · PROJECT AND FLOW BASIS
The peak-hour input is entered as a flow rate for one hour. Required hierarchy checks enforce Minimum ≤ Average Day ≤ Maximum Day and Peak Hour ≥ Average Day. Peak Hour below Maximum Day is a basis-review warning only; event flow is outside this hierarchy.
02 · SCREEN / CHANNEL EQUIPMENT
Screen equipment ratings and channel hydraulics use separate counts. Each channel is modeled with the same entered width and operating depth, with equal flow split across channels in service.
03 · SCREENING DESIGN
hL = (V² − v²) / (2 × 0.7 × g)V = velocity through bar openings; v = approach velocity. Clean bar screens only. Fouled loss is not inferred.04 · CHANNEL HYDRAULICS
Approach velocity uses Q divided by the gross wetted area of the entered number of channels in service. Through-screen velocity uses effective opening area when the selected method supports it. Screen equipment capacity is evaluated from its separate duty count.
| Flow case | Total flow | Approach velocity | Through-screen velocity | Calculated / rated loss | Headloss basis / provenance | Duty utilization |
|---|---|---|---|---|---|---|
| Calculate to populate these values. | ||||||
05 · GRIT REMOVAL
Horizontal-flow chamber velocity criteria are project inputs. Aerated and vortex/proprietary capacity is vendor/project-rated. No generic capture efficiency is predicted.
06 · REDUNDANCY AND FAILURE CASES
Failure scenarios use separate screen and channel counts: one screen out, one channel out, a paired screen-and-channel N−1 case, and all installed screens/channels. Vendor headloss curves are not extrapolated for failure cases.
| Scenario | Available screens | Active channels | Hydraulic capacity | Utilization | Capacity margin | Actual shortfall | Approach velocity | Through-screen velocity | Headloss | Headloss method / basis |
|---|---|---|---|---|---|---|---|---|---|---|
| Calculate to populate these values. | ||||||||||
07 · OPTIONAL HANDLING BASIS
Solids identity: influent TSS is not screenings and is not grit. Screenings and grit are separate from primary sludge and biological sludge. Quantities below require a declared measured/project/vendor rate.
08 · DETAILED RESULTS
Calculate a valid input snapshot to populate detailed results. Infeasible inputs do not expose a normal design result.
Revision ww-headworks-1.1.0 · deterministic local calculation · explicit project/vendor assumptions
Vendor-rated screen/grit performance must be verified for the selected equipment. Generic hydraulic screening does not predict proprietary capture efficiency. Influent TSS is not screenings production and is not grit production. This preliminary check does not replace equipment supplier hydraulic curves or detailed civil/mechanical design.