Seawater Intake & Screening Preliminary Assessment

Preliminary arithmetic for declared steady seawater intake screen and approach-channel cases.

Seawater desalinationStage 01 — Seawater Intake
Status
Available
SEAWATER INTAKE · PRELIMINARY ASSESSMENT

Case inputs & hydraulic screening

Allocate the declared flow across operating screens and review area-based mean velocities.

Screening only: no local face-normal velocity, fish-protection assessment, total intake loss or pump/NPSH calculation.

Display units
A

Case & flow

0 running screens

Only RUNNING screens participate. Equal split divides by the running count; manual flows must reconcile to the declared total with no redistribution.

B

Screen configuration

Maintain the full roster; edit one screen at a time.

ScreenOperating statusAllocated flowGeometryCalculationActions
Screen 1Excluded0 of 4 geometry groupsExcluded
Screen 1Excluded
Allocated flowExcludedGeometry0 of 4 groups
Selected screen

Screen 1

Detailed inputs

Screen identity

Approach channel

Channel-area source required

Screen face and open area

Engineering sources & evidence 0/4 key references recorded
C

Optional engineering evidence

Enable only assessments supported by a documented, applicable basis.

Component headloss assessment

Requires a declared K and matching reference velocity evidence.

Not evaluated

Project criterion comparison

No universal ecological or regulatory threshold is supplied.

Not evaluated
D

Calculation & results

Review the calculated screen split, velocity bases and any declared engineering assessment.

Calculate a case to enable its engineering report.

Enter the case flow and screen areas, then calculate to review the declared profile.

01

Engineering Basis

Methodology

Preliminary arithmetic for declared steady seawater intake screen and approach-channel cases.

Scope / Limitations

  • Compare explicitly equal or manually reconciled screen flows, channel-section mean velocity, net open area, and optional component headloss from a documented matching K reference. A project criterion is compared only when its source and exact metric, denominator, and plane match. The result is arithmetic only; local screen-face velocity distribution, screen capacity, fish protection, permits, ecology, equipment selection, and design acceptance are outside scope.
02

Engineering Path

Workflow

  • Seawater desalinationA membrane-led desalination train from intake and pretreatment through chemical conditioning, UF/MF where applicable, RO, conditioning, disinfection, and product water.
    Stage 01 — Seawater IntakeReturn to Stage 01