Stufe 01 · Quelle / Basis
Seawater Intake
Set intake hydraulics and the feedwater basis.
Zweck
Establish the flow, salinity, temperature, solids, and biological basis that drives pretreatment and RO design.
Engineering-Fragen
- What intake condition and seasonal envelope must the plant handle?
- What solids and biological loads arrive at the plant?
- What intake or outfall constraints affect recovery?
Wichtige Eingaben
- Intake flowm³/h
- Seawater temperature°C
- Seawater TDSmg/L
- Intake turbidityNTU
Wichtige Ausgaben
- Declared RO-feed design flowm³/h
- Declared salinity envelopemg/L
Randbedingungen / Auslegungsaspekte
- Seawater quality is not a single fixed number.
- Intake, pretreatment, RO, and concentrate decisions are coupled at the process level.
Engineering-Hinweis
Unterstützende Forschung
Unterstützende Forschung
No stage-specific research mapping is published for this boundary.