Fase 01 · Fonte / base
Seawater Intake
Set intake hydraulics and the feedwater basis.
Scopo
Establish the flow, salinity, temperature, solids, and biological basis that drives pretreatment and RO design.
Domande ingegneristiche
- What intake condition and seasonal envelope must the plant handle?
- What solids and biological loads arrive at the plant?
- What intake or outfall constraints affect recovery?
Input chiave
- Intake flowm³/h
- Seawater temperature°C
- Seawater TDSmg/L
- Intake turbidityNTU
Output chiave
- Declared RO-feed design flowm³/h
- Declared salinity envelopemg/L
Vincoli / considerazioni di progetto
- Seawater quality is not a single fixed number.
- Intake, pretreatment, RO, and concentrate decisions are coupled at the process level.
Guida ingegneristica
Ricerca di supporto
Ricerca di supporto
No stage-specific research mapping is published for this boundary.