阶段 01 · 水源与基础
Seawater Intake
Set intake hydraulics and the feedwater basis.
目的
Establish the flow, salinity, temperature, solids, and biological basis that drives pretreatment and RO design.
工程问题
- What intake condition and seasonal envelope must the plant handle?
- What solids and biological loads arrive at the plant?
- What intake or outfall constraints affect recovery?
关键输入
- Intake flowm³/h
- Seawater temperature°C
- Seawater TDSmg/L
- Intake turbidityNTU
关键输出
- Declared RO-feed design flowm³/h
- Declared salinity envelopemg/L
约束 / 设计考虑
- Seawater quality is not a single fixed number.
- Intake, pretreatment, RO, and concentrate decisions are coupled at the process level.
工程指导
支持研究
支持研究
No stage-specific research mapping is published for this boundary.