Ingenieurwerkzeug · Aufbereitungsprozess-Design

FluxMatrix Nachklärung und Feststofftrennung

Prüfen Sie Nachklärbecken-Sedimentation, Feststofffluss und RAS-Betriebsfenster anhand von Beckengeometrie und Belastungen.

Status
Verfügbar
Phase
Stationäre Klärbecken-Vorprüfung
Einheiten
Metrisch / imperial

FluxMatrix Studio

Steady-state secondary clarifier solids-flux and state-point analysis for activated sludge systems.

Detailed visualization focus
Display units
Calculating…

01 · Geometry

Clarifier geometry

Area / weir
For rectangular geometry, blank uses 2 × (L + W). For circular geometry, blank uses π × D.

02 · Operating loads

Hydraulic and solids loading

Flows / concentrations
The selected settling correlation uses SVI in mL/g.

03 · Settling model

Vesilind correlation

v0 / k
The default SVI correlation is a screening approximation; site-specific settling test data are more reliable.

Output · Operating status

Results overview

Average case
Selected case status Safe / underloaded Waiting for calculation.
Average case Safe / underloaded
Peak case Unstable / overloaded
Limiting flux GL — kg/(m²·h)
Surface overflow rate — m/h
Solids loading SLR — kg/(m²·h)
Theoretical RAS concentration — mg/L
Smallest selected-case margin — Minimum of clarification / thickening margin

Primary visualization · SPA

State-point / flux plot

Gg / Gt / GL
Hover or focus a plotted marker for a numeric readout.

The active case is shown with solid curves and markers. The inactive case remains as a reference marker so average versus peak behavior can be compared without changing the input basis.

Condition view · Illustrative

Clarifier condition visualizer

—
Illustrative condition view based on current solids-loading and flux margins. Not a CFD model or a field blanket measurement replacement.
Influent → feedwell Effluent Effluent RAS withdrawal Center feedwell Clarified upper zone Sludge blanket Dense bottom solids
Load-ratio mapping pending. Clarification condition: pending. Blanket accumulation risk: pending.

The blanket fill is a deterministic visual mapping from Ga / GL only. V1 does not report a numeric sludge blanket depth.

Sensitivity scan · RAS

RAS operating window

0.20 → 1.50 Qr/Q

Deterministic scan for the selected operating case. Every point recomputes underflow velocity, total-flux limiting capacity, demand, margins, and status.

RAS operating window scan results
Qr / QQr (m³/h)Load ratioMinimum marginStatus

Review · Deterministic diagnostics

Diagnostics and recommendations

Screening flags

Warnings

  • No warnings yet.

Recommendations

  • No recommendations yet.

Traceability · Calculation record

Verification

A concise record of the current validated calculation basis.

Calculation statusPending
Selected caseAverage
Model / correlationDaigger-Roper (1985)
Verification availabilityAwaiting current result

Dieses Engineering-Tool ist derzeit nur in englischer Sprache verfügbar.

01

Ingenieurtechnische Grundlage

Methodik

Der Arbeitsbereich zeigt die akzeptierte Berechnungsantwort und erhält die deklarierten mittleren und Spitzenbetriebsfälle.

Vorläufiges Screening der Feststofftrennung mit Absetzgeschwindigkeit, Schwerkraft- und Gesamtfluss, Zustandspunktverhalten, dichtem Grenzfluss, Klär-/Eindickstatus und Diagnostik.

Normen / Referenzgrundlage

Secondary clarifier screeningSolids fluxPreliminary screening

Annahmen

  • Für die vorläufige Prozessbewertung sind deklarierte Beckenabmessungen und Betriebslasten zu verwenden.
  • Einheiten und technische Kennungen behalten ihre kanonische Bedeutung.

Umfang / Grenzen

  • Die endgültige Auslegung ist anhand von Projektdaten, geltenden Normen und Prüfung durch die verantwortliche Ingenieurperson zu bestätigen.
02

Ingenieurpfad

Anwendung

Szenario

Arbeitsablauf

  • Abwasser Acht Entscheidungsstufen von Zulaufannahme und Vorbehandlung über alternative biologische Pfade, Nachklärung und optionale weitergehende Behandlung bis zu Desinfektion und Ablaufprüfung.
    Stufe 05 — Sekundäre FeststofftrennungZur Stufe 05