Base de conception de l’influent des eaux usées
Établissez la base hydraulique, de concentration et de charge massique pour la conception des traitements des eaux usées en aval.
Project / basis
Identify this influent basis
Project details appear in the report and do not change the calculation.
Additional report details and interpretation
Interpretation context only. It does not create permit logic or effluent targets.
References appear only when sample point, process declaration, case, and sampling basis are compatible. They are not acceptance criteria.
Hydraulic basis
Average and peak flow
Start with average daily flow. Maximum-day, peak-hour, and minimum flows are optional.
Required. Canonical basis: m³/d.
Average flow period and location
Optional maximum-day, peak-hour, and minimum flows
For each case, choose either a direct flow or a factor. Only the selected input is shown.
Peak-hour flow
Optional · canonical m³/hThe declared interval remains one peak hour, even when displayed as an MGD rate.
Changing interval clears the entered minimum flow so it can be re-entered on the new basis.
Influent quality
Average concentrations
Enter available values. Concentrations use mg/L with the analyte basis shown beside each label.
Common design-basis parameters
Leave unavailable values blankNo mass load is calculated.
Canonical storage: °C. No mass load is calculated.
Average concentration basis
Period, location, and source notes
Additional parameters · VSS, orthophosphate-P, oil & grease, TDS, conductivity, custom
Optional average concentrations
Custom constituents
Up to five named concentrations. Custom rows do not feed built-in ratios.
Peak / variability
Optional peak concentration cases
Add a separate concentration record only when it is available for the matching maximum-day or peak-hour flow.
Maximum-day concentration record
Use a sample from the same 24-hour period as the maximum-day flow.
Period, location, and source notes
Maximum-day concentrations
Optional maximum-day analytes
Peak-hour concentration record
Use a sample from the same hour and location as the peak-hour flow.
Period, location, and source notes
Peak-hour concentrations
Optional peak-hour analytes
Advanced / Event basisOne bounded event or shock basisOptional · no recurrence or time-series modeling
Enter one declared event only. Event rate and integrated mass require event flow/concentration pairing; duration is required for integrated mass.
Optional · Available · Extends Wastewater Influent Basis
Wastewater Influent Basis — Acceptance Criteria Extension
Compare project-declared criteria with traceable influent cases. A comparison identifies a declared design or acceptance gap; it does not select a treatment process.
ATLAS compares declared criteria. It does not determine which regulatory, utility, permit, or contractual limit applies to the project.
Comparison basis
Declare each observed case time basis
Sampling method, period, location, source, and point remain in the primary Influent Basis. Select the actual averaging or event context here; ATLAS will not infer it from a label or timestamp.
Declared criteria
Project acceptance criteria
No project criterion is preloaded. Add limits and reference text supplied by the project or owner.
Comparison results
Declared acceptance criteria comparison
A current accepted Influent Basis case is required. Editing the primary basis invalidates these comparison results until its new result is accepted.
Cet outil d’ingénierie est actuellement disponible uniquement en anglais.
Base d’ingénierie
Méthodologie
Les valeurs hydrauliques et de charge massique sont calculées à partir du débit et de la concentration déclarés pour chaque cas apparié, puis les charges sont normalisées en unités SI canoniques.
Une charge de pointe mesurée n’est indiquée que si le débit et la concentration sont explicitement appariés pour le cas concerné ; un scénario maintenant la moyenne reste une estimation.
Hypothèses
- Les facteurs de débit et les métadonnées d’échantillon sont des données de projet déclarées par l’utilisateur.
- Les données manquantes restent manquantes ; l’outil n’infère ni concentration ni charge non appariée.
Périmètre / Limites
- Cette base ne détermine ni conformité, ni acceptabilité du procédé, ni demande en oxygène, ni dosage chimique, ni volume d’égalisation, ni dimensionnement des équipements en aval.
Parcours d’ingénierie
Contexte amont
- Débit entrant et données d’échantillon déclarés Saisissez le débit, la concentration, la base d’échantillonnage et les métadonnées de source déclarés pour le projet.
Décision de cet outil
- Base de conception de l’influent des eaux usées Établit une base hydraulique et de charge massique exploitable en calcul, en conservant l’appariement explicite des cas.
Étape d’ingénierie en aval
- Concepteur d’Égalisation des Eaux Usées Ces outils servent à des calculs de procédé distincts. Les valeurs ne sont pas transférées automatiquement entre outils.
- Conception des clarificateurs Ces outils servent à des calculs de procédé distincts. Les valeurs ne sont pas transférées automatiquement entre outils.
- BNRMatrix — Élimination biologique des nutriments Ces outils servent à des calculs de procédé distincts. Les valeurs ne sont pas transférées automatiquement entre outils.