Ferramenta de engenharia · Tratamento de Águas Residuais
Base de projeto do afluente de águas residuais
Estabeleça a base hidráulica, de concentração e de carga mássica para o projeto do tratamento de águas residuais a jusante.
Project / basis
Identify this influent basis
Project details appear in the report and do not change the calculation.
Additional report details and interpretation
Interpretation context only. It does not create permit logic or effluent targets.
References appear only when sample point, process declaration, case, and sampling basis are compatible. They are not acceptance criteria.
Hydraulic basis
Average and peak flow
Start with average daily flow. Maximum-day, peak-hour, and minimum flows are optional.
Required. Canonical basis: m³/d.
Average flow period and location
Optional maximum-day, peak-hour, and minimum flows
For each case, choose either a direct flow or a factor. Only the selected input is shown.
Peak-hour flow
Optional · canonical m³/hThe declared interval remains one peak hour, even when displayed as an MGD rate.
Changing interval clears the entered minimum flow so it can be re-entered on the new basis.
Influent quality
Average concentrations
Enter available values. Concentrations use mg/L with the analyte basis shown beside each label.
Common design-basis parameters
Leave unavailable values blankNo mass load is calculated.
Canonical storage: °C. No mass load is calculated.
Average concentration basis
Period, location, and source notes
Additional parameters · VSS, orthophosphate-P, oil & grease, TDS, conductivity, custom
Optional average concentrations
Custom constituents
Up to five named concentrations. Custom rows do not feed built-in ratios.
Peak / variability
Optional peak concentration cases
Add a separate concentration record only when it is available for the matching maximum-day or peak-hour flow.
Maximum-day concentration record
Use a sample from the same 24-hour period as the maximum-day flow.
Period, location, and source notes
Maximum-day concentrations
Optional maximum-day analytes
Peak-hour concentration record
Use a sample from the same hour and location as the peak-hour flow.
Period, location, and source notes
Peak-hour concentrations
Optional peak-hour analytes
Advanced / Event basisOne bounded event or shock basisOptional · no recurrence or time-series modeling
Enter one declared event only. Event rate and integrated mass require event flow/concentration pairing; duration is required for integrated mass.
Optional · Available · Extends Wastewater Influent Basis
Wastewater Influent Basis — Acceptance Criteria Extension
Compare project-declared criteria with traceable influent cases. A comparison identifies a declared design or acceptance gap; it does not select a treatment process.
ATLAS compares declared criteria. It does not determine which regulatory, utility, permit, or contractual limit applies to the project.
Comparison basis
Declare each observed case time basis
Sampling method, period, location, source, and point remain in the primary Influent Basis. Select the actual averaging or event context here; ATLAS will not infer it from a label or timestamp.
Declared criteria
Project acceptance criteria
No project criterion is preloaded. Add limits and reference text supplied by the project or owner.
Comparison results
Declared acceptance criteria comparison
A current accepted Influent Basis case is required. Editing the primary basis invalidates these comparison results until its new result is accepted.
Esta ferramenta de engenharia está disponível atualmente apenas em inglês.
Base de engenharia
Metodologia
Os valores hidráulicos e de carga mássica são calculados com a vazão e a concentração declaradas para cada caso pareado; as cargas são normalizadas para unidades SI canônicas.
Uma carga de pico medida só é informada quando vazão e concentração estão explicitamente pareadas para o caso; um cenário que mantém a média continua sendo uma estimativa.
Premissas
- Fatores de vazão e metadados da amostra são dados de projeto declarados pelo usuário.
- Dados ausentes permanecem ausentes; a ferramenta não infere concentração ou carga sem pareamento.
Escopo / Limitações
- Esta base não determina conformidade, aceitação do processo, demanda de oxigênio, dose química, volume de equalização nem dimensionamento de equipamentos a jusante.
Caminho de engenharia
Contexto a montante
- Vazão afluente e dados de amostra declarados Informe a vazão, a concentração, a base de amostragem e os metadados de origem declarados para o projeto.
Decisão desta ferramenta
- Base de projeto do afluente de águas residuais Estabelece uma base hidráulica e de carga mássica pronta para cálculo, mantendo o pareamento explícito de cada caso.
Próxima etapa de engenharia
- Projetista de Equalização de Águas Residuais Estas ferramentas apoiam cálculos de processo separados. Os valores não são transferidos automaticamente entre ferramentas.
- Projeto de decantadores Estas ferramentas apoiam cálculos de processo separados. Os valores não são transferidos automaticamente entre ferramentas.
- BNRMatrix de Remoção Biológica de Nutrientes Estas ferramentas apoiam cálculos de processo separados. Os valores não são transferidos automaticamente entre ferramentas.