Skip to main content
Torna a Strumenti

Strumento di ingegneria · Trattamento dell’acqua

Bilancio idrico e di massa dell’impianto

Risolvi un bilancio stazionario di acqua e componenti dell’impianto tra processi, scarichi e flussi di ricircolo dichiarati.

Stato
Disponibile
PROJECT · OPTIONAL

Project metadata

Report context for exports; it does not change calculations.Edit detailsHide details

01 · USER INPUT

Design basis and inputs

Name each process, declare product and waste-side recycle fractions, and choose a same-process or upstream recycle destination.

Coagulation & Conditioning
Coagulation & Conditioning
Clarification
Clarification
Granular Media Filtration
Granular Media Filtration
Clearwell
Clearwell
Engineering calculations run locally in this browser after assets load.

02 · CALCULATED RESULT

Results at a glance

Load or enter inputs, then calculate to create an authoritative result.

03 · REPORTING

Exports and verification

CSV contains input and output detail. PDF uses the current calculation and report metadata.

Verification suite

Calculation revision 6ed6a0c4

68 focused fixtures: one-loop fixture, named upstream recycle, inactive recycle targets, mass order, closure, fraction validation, matrix singularity, and structured export contracts. Tests are deterministic and run without network access.

Questo strumento di ingegneria è attualmente disponibile solo in inglese.

01

Base ingegneristica

Metodologia

Risolva il bilancio stazionario dichiarato di acqua e costituenti con frazioni di processo, rimozioni, aggiunte e ricircoli allo stesso processo o a uno a monte. Gli errori di chiusura di acqua e massa sono riportati esplicitamente; i flussi non vengono normalizzati per forzare la chiusura.

The steady-state water network is written as F = b + A F and solved with deterministic pivoted Gauss-Jordan elimination.

Each process forwards its declared fraction of inlet flow to the next process. At the final process, forward flow is the final product stream.

The remainder is the waste-side flow. The entered recycle fraction applies to this waste split and returns only to the same process or an upstream process.

Constituent mass flow is water flow multiplied by concentration with unit conversion. At each node, removal is applied to inlet constituent mass, then the entered addition is applied, then the outlet constituent mass is split using the water-flow fractions.

Accumulation is assumed to be zero at steady state. Water and constituent closure errors are reported separately. Errors within the documented tolerance are reported as zero; the flows and masses are not normalized to force closure.

Water closure tolerance is max(1e-8 m³/d, external feed × 1e-10); constituent mass tolerance is max(1e-8 kg/d, (external mass + entered additions) × 1e-10).

Ambito / Limiti

  • Esamina l’alimentazione di processo richiesta, il prodotto finale, gli scarichi e la chiusura del bilancio in base alle frazioni di processo inserite. I casi terminali senza prodotto e gli input a valle non risolti restano espliciti.
  • This is a compact steady-state process train, not a general graphical or dynamic simulator.
  • No process-selection model, reaction chemistry, equilibrium, or kinetics are predicted. Removal and addition are user-entered.
  • Recycle is limited to the same process or an upstream process. Downstream bypass or side-stream routing is not represented.
  • The loaded example values are synthetic and do not represent a required treatment train.
  • Near-singular systems and negative or nonfinite solved flows are rejected.
  • Only SI flow units (m³/d) and constituent mass units (kg/d) are implemented. MGD and gpm conversion paths are not available.
02

Percorso ingegneristico

Contesto a monte

  • Configurazione e casi di progetto dell’intero impianto Usa schema di processo, casi di portata e ipotesi operative dichiarate come contesto; questo strumento supporta il progetto di impianto e non è una fase sequenziale.

Decisione di questo strumento

  • Bilancio idrico e di massa dell’impianto Risolvi un bilancio stazionario di acqua e componenti dell’impianto tra processi, scarichi e flussi di ricircolo dichiarati.

Passaggio ingegneristico a valle

  • Verifica delle unità e del progetto integrato Coordina questo risultato globale con la progettazione delle unità e la revisione del progetto; non implica una Fase 07 né una dipendenza fissa.

Flusso di lavoro