엔지니어링 도구 · 폐수 처리
폐수 유입수 설계 기준
후속 폐수 처리 설계를 위한 수리학, 농도 및 질량 부하 기준을 설정합니다.
Project / basis
Identify this influent basis
Project details appear in the report and do not change the calculation.
Additional report details and interpretation
Interpretation context only. It does not create permit logic or effluent targets.
References appear only when sample point, process declaration, case, and sampling basis are compatible. They are not acceptance criteria.
Hydraulic basis
Average and peak flow
Start with average daily flow. Maximum-day, peak-hour, and minimum flows are optional.
Required. Canonical basis: m³/d.
Average flow period and location
Optional maximum-day, peak-hour, and minimum flows
For each case, choose either a direct flow or a factor. Only the selected input is shown.
Peak-hour flow
Optional · canonical m³/hThe declared interval remains one peak hour, even when displayed as an MGD rate.
Changing interval clears the entered minimum flow so it can be re-entered on the new basis.
Influent quality
Average concentrations
Enter available values. Concentrations use mg/L with the analyte basis shown beside each label.
Common design-basis parameters
Leave unavailable values blankNo mass load is calculated.
Canonical storage: °C. No mass load is calculated.
Average concentration basis
Period, location, and source notes
Additional parameters · VSS, orthophosphate-P, oil & grease, TDS, conductivity, custom
Optional average concentrations
Custom constituents
Up to five named concentrations. Custom rows do not feed built-in ratios.
Peak / variability
Optional peak concentration cases
Add a separate concentration record only when it is available for the matching maximum-day or peak-hour flow.
Maximum-day concentration record
Use a sample from the same 24-hour period as the maximum-day flow.
Period, location, and source notes
Maximum-day concentrations
Optional maximum-day analytes
Peak-hour concentration record
Use a sample from the same hour and location as the peak-hour flow.
Period, location, and source notes
Peak-hour concentrations
Optional peak-hour analytes
Advanced / Event basisOne bounded event or shock basisOptional · no recurrence or time-series modeling
Enter one declared event only. Event rate and integrated mass require event flow/concentration pairing; duration is required for integrated mass.
Optional · Available · Extends Wastewater Influent Basis
Wastewater Influent Basis — Acceptance Criteria Extension
Compare project-declared criteria with traceable influent cases. A comparison identifies a declared design or acceptance gap; it does not select a treatment process.
ATLAS compares declared criteria. It does not determine which regulatory, utility, permit, or contractual limit applies to the project.
Comparison basis
Declare each observed case time basis
Sampling method, period, location, source, and point remain in the primary Influent Basis. Select the actual averaging or event context here; ATLAS will not infer it from a label or timestamp.
Declared criteria
Project acceptance criteria
No project criterion is preloaded. Add limits and reference text supplied by the project or owner.
Comparison results
Declared acceptance criteria comparison
A current accepted Influent Basis case is required. Editing the primary basis invalidates these comparison results until its new result is accepted.
이 엔지니어링 도구는 현재 영어로만 제공됩니다.
엔지니어링 근거
방법론
유압 및 질량 부하 값은 각 쌍으로 지정된 조건의 선언 유량과 농도로 계산하고 부하를 정규 SI 단위로 정규화합니다.
측정 피크 부하는 해당 조건의 유량과 농도가 명시적으로 짝지어진 경우에만 보고합니다. 평균 유지 시나리오는 추정치입니다.
가정
- 유량 계수와 시료 메타데이터는 사용자가 선언하는 프로젝트 입력입니다.
- 누락 데이터는 누락 상태로 유지하며 짝이 없는 농도나 부하를 추론하지 않습니다.
범위 / 제한사항
- 이 기준은 규정 준수, 공정 채택 가능성, 산소 요구량, 약품 주입량, 균등화 용량 또는 후속 설비 크기를 결정하지 않습니다.
엔지니어링 경로
상류 맥락
- 선언된 유입 유량 및 시료 데이터 프로젝트에서 선언한 유량, 농도, 샘플링 기준 및 출처 메타데이터를 입력합니다.
현재 도구의 설계 결정
- 폐수 유입수 설계 기준 각 조건의 명시적 짝을 유지하면서 계산에 사용할 수 있는 유압 및 질량 부하 기준을 설정합니다.
하류 엔지니어링 단계
- 폐수 유량조정조 설계 도구 이 도구들은 별도의 공정 계산을 지원합니다. 값은 도구 간에 자동으로 전달되지 않습니다.
- 침전지 설계 이 도구들은 별도의 공정 계산을 지원합니다. 값은 도구 간에 자동으로 전달되지 않습니다.
- BNRMatrix 생물학적 영양염류 제거 이 도구들은 별도의 공정 계산을 지원합니다. 값은 도구 간에 자동으로 전달되지 않습니다.