SYNTHETIC SAMPLE. Sample values are synthetic engineering fixtures, not plant measurements. Review and edit the submitted basis before relying on a result.
Conditional calculation only. Vendor suitability, long-term fouling and actual effluent compliance are not inferred.
01
Project & Process
02
Flow & Wastewater
m³/d
m³/d
m³/d
Concentration and load stay consistent using feed flow; the selected basis controls which value you edit.
mg/L
mg/L
kg/d
°C
03
Biological Design
d
kg/m³
kg/m³
kg/d
—
—
kg/d
kg/d
kg/d
04
Membrane System
LMH
LMH
LMH
LMH
LMH
m³/h
h
h
LMH
—
kg/m³
Filtration cycle and instantaneous flux
min
min
min
LMH
LMH
min
Installed membrane trains
—
m²
—
m²
—
m²
05
Aeration & Equipment
kg/d
—
kg/d
—
—
mg/L
—
°C
mg/L
Membrane scour basis
m³ air/(h·m²), declared reference
m²
—
kPa
K
kPa
m³/h (declared air basis)
Calculated pump duties
Do not enter the same equipment in both direct power and calculated duty inputs; the Worker result reflects the declared energy scope.
Direct power loads
Do not enter the same equipment in both direct power and calculated duty inputs; the Worker result reflects the declared energy scope.
kW
h/d
kW
h/d
kW
h/d
kW
h/d
06
Scenario editor
Scenarios inherit the base case. Edit only the values that differ; every comparison is calculated by the Worker.
No scenario results are available.
07
Calculate design
Values below are mapped from the submitted input snapshot and authoritative Worker result.
08
Engineering Results
Run a calculation to see Worker results.
09
Engineering Design Review
Not assessed
10
Generate report
This report uses the immutable Worker result and its returned input snapshot.
01
Design Basis
Methodology
Model basis: MBRMatrix steady-state engineering model v1.2 applies material balances and capacity calculations to the declared process configuration, feed conditions, and design inputs.
Biological, solids, nitrogen/COD/alkalinity, membrane, aeration, and energy results are reported by domain. Incomplete, underdetermined, or inapplicable domains remain identified as such.
Reference Register
US EPA, Membrane Bioreactors — Wastewater Management Fact Sheet, EPA 832-F-07-015 (2007)US EPA, Municipal Nutrient Removal Technologies Reference Document, EPA 832-R-08-006 (2008)Ontario Design Guidelines for Sewage Works, §12.4.3 (2008 edition)US EPA, Nutrient Control Design Manual, EPA/600-R-10-100 (2010)MANN+HUMMEL, MICRODYN BIO-CEL MBR Design Guidelines, Rev. C (2019; historical reference)
Assumptions
Design flow, influent loads and concentrations, treatment targets, process configuration, and operating conditions come from project inputs; unprovided plant conditions are not inferred.
Only result domains supported by the submitted basis are assessed. Missing or insufficient inputs are identified rather than filled with assumed values.
Membrane flux and cycle, modules, trains, outage cases, and equipment data require project and current supplier review.
Scope / Limitations
Preliminary steady-state sizing and conditional capacity assessment for the configured biological reactor, membrane system, aeration, and declared equipment duty. N−1 capacity depends on supplied train and outage data.
This is not a dynamic or transient process simulation. It does not establish guaranteed effluent quality, regulatory compliance, permit status, or vendor suitability.
Verify current supplier operating envelopes, pretreatment, site data, and applicable requirements; final design requires qualified engineering review.
02
Engineering Path
Application
Municipal WaterSource water, purification, and utility decisions.
WastewaterEight decision stages from influent acceptance through preliminary and primary treatment, alternative biological paths, secondary solids separation, optional polishing, disinfection, and effluent/reuse/discharge review.