Skip to main content
Zurück zu Rechner

Ingenieurwerkzeug · Wasseraufbereitung

PFAS-Lead/Lag-Behälterkonfiguration

Dokumentieren Sie Zugtopologie, explizite Durchflüsse je Zug, Geometrie, Leerbettkontaktzeit und die manuelle Übergabe des v1-Inventars.

VERFÜGBAR
VERFÜGBAR

Engineering Workbench language: English

PFAS · STAGE 4 · CONFIGURATION

PFAS Lead/Lag Vessel Configuration

Document vessel topology, explicit train flows, geometry, empty-bed contact time, and a manual v1 inventory handoff.

Engineering Workbench language: English

01

Configuration basis

Operating trains
Vessel roster

01

Vessel ID

Geometry and train hydraulics only. No adsorption capacity, pressure drop, PFAS breakthrough, treatment duration, vendor rating, or media replacement forecast is calculated.

02

Engineering review

INPUT NEEDS CORRECTION

Geometry and train hydraulics only. No adsorption capacity, pressure drop, PFAS breakthrough, treatment duration, vendor rating, or media replacement forecast is calculated.

Dieses Engineering-Tool ist derzeit nur in englischer Sprache verfügbar.

01

Ingenieurtechnische Grundlage

Methodik

Use entered train flow and vessel geometry to calculate packed volume, empty-bed contact time, and superficial velocity where diameter is supplied. Empty-bed contact time is active packed-bed volume divided by the entered flow, converted to minutes.

Normen / Referenzgrundlage

Owner-entered train and vessel arrangementSupplier geometry and media evidence

Annahmen

  • Only entered geometry, flow split, operating state, and media evidence are used.
  • Standby vessels are excluded from active totals.

Umfang / Grenzen

  • This configuration screen does not predict compound-specific breakthrough, removal, carbon service life, or final vessel suitability. Verify vessel, media, hydraulics, and changeover criteria with the project engineer and suppliers.
02

Ingenieurpfad

Arbeitsablauf

  • PFAS und KohleAdsorptionspfad von der Zulaufcharakterisierung über Vorbehandlung, Aktivkohlebettauslegung und Lead/Lag-Betrieb bis zur Durchbruchüberwachung und Medienwechselentscheidung.
    Stufe 04 — Lead/Lag-KohlebehälterZur Stufe 04