PFAS Lead/Lag Vessel Configuration

Document vessel topology, explicit train flows, geometry, empty-bed contact time, and a manual v1 inventory handoff.

Engineering Workbench language: English

01

Configuration basis

Operating trains
Vessel roster

01

Vessel ID

Geometry and train hydraulics only. No adsorption capacity, pressure drop, PFAS breakthrough, treatment duration, vendor rating, or media replacement forecast is calculated.

02

Engineering review

INPUT NEEDS CORRECTION

Geometry and train hydraulics only. No adsorption capacity, pressure drop, PFAS breakthrough, treatment duration, vendor rating, or media replacement forecast is calculated.

此工程工具目前仅提供英文版本。

01

工程依据

方法

Use entered train flow and vessel geometry to calculate packed volume, empty-bed contact time, and superficial velocity where diameter is supplied. Empty-bed contact time is active packed-bed volume divided by the entered flow, converted to minutes.

标准 / 参考依据

Owner-entered train and vessel arrangementSupplier geometry and media evidence

假设

  • Only entered geometry, flow split, operating state, and media evidence are used.
  • Standby vessels are excluded from active totals.

范围 / 限制

  • This configuration screen does not predict compound-specific breakthrough, removal, carbon service life, or final vessel suitability. Verify vessel, media, hydraulics, and changeover criteria with the project engineer and suppliers.
02

工程路径

工作流

  • PFAS 与活性炭从进水表征、预处理、炭床设计,到前后床运行、突破监测以及更换决策的吸附处理路径。
    阶段 04 — 前置/后置炭罐配置返回阶段 04