PFAS · STAGE 4 · CONFIGURATION

PFAS Lead/Lag Vessel Configuration

Document vessel topology, explicit train flows, geometry, empty-bed contact time, and a manual v1 inventory handoff.

Engineering Workbench language: English

01

Configuration basis

Operating trains
Vessel roster

01

Vessel ID

Geometry and train hydraulics only. No adsorption capacity, pressure drop, PFAS breakthrough, treatment duration, vendor rating, or media replacement forecast is calculated.

02

Engineering review

INPUT NEEDS CORRECTION

Geometry and train hydraulics only. No adsorption capacity, pressure drop, PFAS breakthrough, treatment duration, vendor rating, or media replacement forecast is calculated.

Cet outil d’ingénierie est actuellement disponible uniquement en anglais.

01

Base d’ingénierie

Méthodologie

Use entered train flow and vessel geometry to calculate packed volume, empty-bed contact time, and superficial velocity where diameter is supplied. Empty-bed contact time is active packed-bed volume divided by the entered flow, converted to minutes.

Normes / Base de référence

Owner-entered train and vessel arrangementSupplier geometry and media evidence

Hypothèses

  • Only entered geometry, flow split, operating state, and media evidence are used.
  • Standby vessels are excluded from active totals.

Périmètre / Limites

  • This configuration screen does not predict compound-specific breakthrough, removal, carbon service life, or final vessel suitability. Verify vessel, media, hydraulics, and changeover criteria with the project engineer and suppliers.
02

Parcours d’ingénierie

Flux de travail

  • PFAS et charbonParcours d’adsorption de la caractérisation de l’influent au prétraitement, au dimensionnement du lit, à l’exploitation en lead/lag, au suivi de percée et à la décision de remplacement.
    Étape 04 — Cuves de charbon lead/lagRetour à l’étape 04