Skip to main content
Torna a Strumenti

Strumento di ingegneria · Trattamento dell’acqua

Configurazione dei vessel PFAS lead/lag

Documenta la topologia, le portate esplicite per treno, la geometria, il tempo di contatto a letto vuoto e il passaggio manuale dell’inventario v1.

DISPONIBILE
DISPONIBILE

Engineering Workbench language: English

PFAS · STAGE 4 · CONFIGURATION

PFAS Lead/Lag Vessel Configuration

Document vessel topology, explicit train flows, geometry, empty-bed contact time, and a manual v1 inventory handoff.

Engineering Workbench language: English

01

Configuration basis

Operating trains
Vessel roster

01

Vessel ID

Geometry and train hydraulics only. No adsorption capacity, pressure drop, PFAS breakthrough, treatment duration, vendor rating, or media replacement forecast is calculated.

02

Engineering review

INPUT NEEDS CORRECTION

Geometry and train hydraulics only. No adsorption capacity, pressure drop, PFAS breakthrough, treatment duration, vendor rating, or media replacement forecast is calculated.

Questo strumento di ingegneria è attualmente disponibile solo in inglese.

01

Base ingegneristica

Metodologia

Use entered train flow and vessel geometry to calculate packed volume, empty-bed contact time, and superficial velocity where diameter is supplied. Empty-bed contact time is active packed-bed volume divided by the entered flow, converted to minutes.

Norme / Base di riferimento

Owner-entered train and vessel arrangementSupplier geometry and media evidence

Ipotesi

  • Only entered geometry, flow split, operating state, and media evidence are used.
  • Standby vessels are excluded from active totals.

Ambito / Limiti

  • This configuration screen does not predict compound-specific breakthrough, removal, carbon service life, or final vessel suitability. Verify vessel, media, hydraulics, and changeover criteria with the project engineer and suppliers.
02

Percorso ingegneristico

Flusso di lavoro

  • PFAS e carbonePercorso di adsorbimento dalla caratterizzazione dell’influente e dal pretrattamento al dimensionamento del letto, all’esercizio lead/lag, al monitoraggio del breakthrough e alla sostituzione.
    Fase 04 — Vessel a carbone lead/lagTorna alla fase 04