01

Configuration basis

Operating trains
Vessel roster

01

Vessel ID

Geometry and train hydraulics only. No adsorption capacity, pressure drop, PFAS breakthrough, treatment duration, vendor rating, or media replacement forecast is calculated.

02

Engineering review

INPUT NEEDS CORRECTION

Geometry and train hydraulics only. No adsorption capacity, pressure drop, PFAS breakthrough, treatment duration, vendor rating, or media replacement forecast is calculated.

이 엔지니어링 도구는 현재 영어로만 제공됩니다.

01

엔지니어링 근거

방법론

Use entered train flow and vessel geometry to calculate packed volume, empty-bed contact time, and superficial velocity where diameter is supplied. Empty-bed contact time is active packed-bed volume divided by the entered flow, converted to minutes.

표준 / 참조 근거

Owner-entered train and vessel arrangementSupplier geometry and media evidence

가정

  • Only entered geometry, flow split, operating state, and media evidence are used.
  • Standby vessels are excluded from active totals.

범위 / 제한사항

  • This configuration screen does not predict compound-specific breakthrough, removal, carbon service life, or final vessel suitability. Verify vessel, media, hydraulics, and changeover criteria with the project engineer and suppliers.
02

엔지니어링 경로

워크플로

  • PFAS와 활성탄유입수 특성화, 전처리, 활성탄 베드 설계, 리드/래그 운전, 파과 모니터링과 교체 의사결정으로 이어지는 흡착 처리 경로입니다.
    단계 04 — lead/lag 활성탄 용기단계로 돌아가기 04