Progettazione dei residui e dei fanghi del trattamento delle acque

Stima i solidi grezzi catturati, la resa dei solidi chimici, i flussi facoltativi di controlavaggio e altri residui, e il volume di fango umido.

Stato
Disponibile
PROJECT · OPTIONAL

Project metadata

Report context for exports; it does not change calculations.Edit detailsHide details

01 · USER INPUT

Design basis and inputs

Add each additional solids source as a separate row.

No additional residual sources.

Engineering calculations run locally in this browser after assets load.

02 · CALCULATED RESULT

Results at a glance

Load or enter inputs, then calculate to create an authoritative result.

03 · REPORTING

Exports and verification

CSV contains input and output detail. PDF uses the current calculation and report metadata.

Verification suite

Calculation revision 6d66d6fb

63 focused fixtures: raw solids conversion/capture, conditional chemical yield, optional paired backwash, named residual rows and contribution shares, wet-sludge conversion, and active-input reporting. Tests are deterministic and run without network access.

Questo strumento di ingegneria è attualmente disponibile solo in inglese.

01

Base ingegneristica

Metodologia

Calcola solidi grezzi catturati, resa dei solidi chimici inserita, solidi opzionali di controlavaggio appaiati e altre correnti nominate, quindi converte i solidi secchi in fango umido con frazione massica e densità inserite. La resa è specifica del progetto/utente; non è incorporata una resa universale.

Raw dry solids = plant flow (m³/d) × raw-water TSS (mg/L) × 0.001; captured raw solids = raw dry solids × capture fraction.

Chemical product mass = flow × product dose × 0.001. Chemical dry solids = product mass × the selected product or active-mass basis × the user-entered yield factor.

Backwash solids are included only when both backwash volume and TSS are entered. Other residual sources are entered as named dry-solids rows.

Combined dry solids are the sum of the entered sources. Source contribution = source dry solids ÷ combined dry solids × 100%; percentages are unavailable when the combined total is zero.

Wet sludge mass = combined dry solids ÷ sludge solids mass fraction. Wet volume = wet mass ÷ entered slurry density.

Ambito / Limiti

  • Scegli la resa in base alla massa del prodotto o del principio attivo e dichiara frazione di solidi e densità del fango. Gli input facoltativi del controlavaggio devono essere inseriti in coppia.
  • Does not select dewatering equipment, predict cake solids, or estimate polymer dose.
  • No explicit return/recycle streams, dewatering, cake export, or disposal quantity is calculated; wet volume uses the entered density and mass-solids fraction. No US-unit conversion path is implemented; inputs and outputs use SI units.
  • No universal coagulant yield is embedded. The yield factor must be entered for the selected mass basis and supported by project or supplier data.
02

Percorso ingegneristico

Contesto a monte

  • Configurazione e casi di progetto dell’intero impianto Usa schema di processo, casi di portata e ipotesi operative dichiarate come contesto; questo strumento supporta il progetto di impianto e non è una fase sequenziale.

Decisione di questo strumento

  • Progettazione dei residui e dei fanghi del trattamento delle acque Stima i solidi grezzi catturati, la resa dei solidi chimici, i flussi facoltativi di controlavaggio e altri residui, e il volume di fango umido.

Passaggio ingegneristico a valle

  • Verifica delle unità e del progetto integrato Coordina questo risultato globale con la progettazione delle unità e la revisione del progetto; non implica una Fase 07 né una dipendenza fissa.

Flusso di lavoro