水处理残余物与污泥设计

估算原水截留固体、药剂产泥量、可选反冲洗及其他残余物,并计算湿污泥浆体积。

状态
已上线
PROJECT · OPTIONAL

Project metadata

Report context for exports; it does not change calculations.Edit detailsHide details

01 · USER INPUT

Design basis and inputs

Add each additional solids source as a separate row.

No additional residual sources.

Engineering calculations run locally in this browser after assets load.

02 · CALCULATED RESULT

Results at a glance

Load or enter inputs, then calculate to create an authoritative result.

03 · REPORTING

Exports and verification

CSV contains input and output detail. PDF uses the current calculation and report metadata.

Verification suite

Calculation revision 6d66d6fb

63 focused fixtures: raw solids conversion/capture, conditional chemical yield, optional paired backwash, named residual rows and contribution shares, wet-sludge conversion, and active-input reporting. Tests are deterministic and run without network access.

此工程工具目前仅提供英文版本。

01

工程依据

方法

计算捕获的原水固体、用户输入的药剂产泥量、成对输入的可选反冲洗固体及命名残余物流,再按输入的固体质量分数和密度换算湿浆。产泥系数应由项目/用户确定;不内置通用混凝剂产泥率。

Raw dry solids = plant flow (m³/d) × raw-water TSS (mg/L) × 0.001; captured raw solids = raw dry solids × capture fraction.

Chemical product mass = flow × product dose × 0.001. Chemical dry solids = product mass × the selected product or active-mass basis × the user-entered yield factor.

Backwash solids are included only when both backwash volume and TSS are entered. Other residual sources are entered as named dry-solids rows.

Combined dry solids are the sum of the entered sources. Source contribution = source dry solids ÷ combined dry solids × 100%; percentages are unavailable when the combined total is zero.

Wet sludge mass = combined dry solids ÷ sludge solids mass fraction. Wet volume = wet mass ÷ entered slurry density.

范围 / 限制

  • 选择按商品药剂质量或有效成分质量计算产率,并声明污泥固体分数和密度。可选反冲洗参数必须成对输入。
  • Does not select dewatering equipment, predict cake solids, or estimate polymer dose.
  • No explicit return/recycle streams, dewatering, cake export, or disposal quantity is calculated; wet volume uses the entered density and mass-solids fraction. No US-unit conversion path is implemented; inputs and outputs use SI units.
  • No universal coagulant yield is embedded. The yield factor must be entered for the selected mass basis and supported by project or supplier data.
02

工程路径

上游背景

  • 全厂工艺配置与设计工况 以声明的工艺布置、流量工况和运行假设作为背景;本工具支持全厂设计,不是顺序工艺阶段。

当前工具决策

  • 水处理残余物与污泥设计 估算原水截留固体、药剂产泥量、可选反冲洗及其他残余物,并计算湿污泥浆体积。

下游工程步骤

  • 单元工艺与综合项目审查 将全厂工具结果与单元工艺设计及项目审查协调;不表示存在第 07 阶段或固定工艺依赖。

工作流

  • 市政饮用水净化 将全厂工具结果与单元工艺设计及项目审查协调;不表示存在第 07 阶段或固定工艺依赖。