Skip to main content
返回 计算工具

工程工具 · 处理工艺设计

臭氧投加与 CT 筛选

根据目标投加浓度计算臭氧发生器规格,并使用实际水温、通用挡板系数与余量进行初步 CT 对比。

市政饮用水净化阶段 04 阶段 05
状态
实时工程工具
模式
投加 / CT 筛查
工况
温度 / 折流系数 / 余量
单位
公制
ATLAS WTS · Process Engineering

Ozone Dosing & CT Calculator

Size the ozone generator for a target applied dose, then run a preliminary CT screen for the contact basin.

General Info

Dosing & Generator Sizing

Typical for a well-designed venturi/fine-bubble injection system: 85-95%. Older or poorly-matched systems can run materially lower (50-70%) — confirm against actual equipment/injector performance data.

Dosing Results
Preliminary CT Screening

CT Results
EPA 40 CFR §141.720(b)(2) Reference Table — Ozone CT Screening (mg·min/L)

Values shown are the published reference table at the 6 temperatures below; this preliminary screen uses the printed continuous equation for the exact entered temperature. Generic baffling is not an approved contact-time basis, so the result is not a regulatory determination.

Powered by ATLAS WTS

此工程工具目前仅提供英文版本。

01

工程依据

方法

CT 合规校验采用美国 EPA《长期2级增强地表水处理规则》(40 CFR §141.720(b)(2))官方隐孢子虫臭氧 CT 表,并使用该条款自带的连续方程进行计算——Log credit = (0.0397 × 1.09757^水温) × CT——该方程在表中每一个温度节点上均能精确复现官方数值。T10 由水力停留时间(接触池体积 ÷ 流量)乘以挡板系数得出,挡板系数采用标准 EPA/AWWA 接触池分级(0.1 无挡板 至 0.7 优良折流)。

理论臭氧投加速率(g/h)等于流量(m³/h)乘以目标投加浓度(mg/L)——量纲精确成立,因为每 1 m³/h 流量下投加 1 mg/L 即等于每小时投加 1 克臭氧。所需发生器规格则将该速率除以气水混合系统的传质效率——并非所生成的臭氧都能溶入水中,设计良好的系统传质效率通常在 85%-95% 之间,实际数值应以设备性能数据为准。

标准 / 参考依据

40 CFR §141.720(b)(2)EPA/AWWA contact-basin baffling reference

假设

  • CT 按水力停留时间乘以通用折流系数估算。
  • 筛查采用输入的水温、折流系数和余量。

范围 / 限制

  • 这是 CT 初步筛查;通用折流系数不能作为法规符合性依据。
  • 模型不含经批准的接触时间/余量依据,因此不能判定法规符合性。
02

工程路径

场景

工作流