Engineering Tool · Wastewater Treatment
Wastewater Influent Basis
Convert wastewater flow and water-quality data into a hydraulic and mass-loading design basis for downstream treatment.
Project / basis
Identify this influent basis
Project details appear in the report and do not change the calculation.
Additional report details and interpretation
Interpretation context only. It does not create permit logic or effluent targets.
References appear only when sample point, process declaration, case, and sampling basis are compatible. They are not acceptance criteria.
Hydraulic basis
Average and peak flow
Start with average daily flow. Maximum-day, peak-hour, and minimum flows are optional.
Required. Canonical basis: m³/d.
Average flow period and location
Optional maximum-day, peak-hour, and minimum flows
For each case, choose either a direct flow or a factor. Only the selected input is shown.
Peak-hour flow
Optional · canonical m³/hThe declared interval remains one peak hour, even when displayed as an MGD rate.
Changing interval clears the entered minimum flow so it can be re-entered on the new basis.
Influent quality
Average concentrations
Enter available values. Concentrations use mg/L with the analyte basis shown beside each label.
Common design-basis parameters
Leave unavailable values blankNo mass load is calculated.
Canonical storage: °C. No mass load is calculated.
Average concentration basis
Period, location, and source notes
Additional parameters · VSS, orthophosphate-P, oil & grease, TDS, conductivity, custom
Optional average concentrations
Custom constituents
Up to five named concentrations. Custom rows do not feed built-in ratios.
Peak / variability
Optional peak concentration cases
Add a separate concentration record only when it is available for the matching maximum-day or peak-hour flow.
Maximum-day concentration record
Use a sample from the same 24-hour period as the maximum-day flow.
Period, location, and source notes
Maximum-day concentrations
Optional maximum-day analytes
Peak-hour concentration record
Use a sample from the same hour and location as the peak-hour flow.
Period, location, and source notes
Peak-hour concentrations
Optional peak-hour analytes
Advanced / Event basisOne bounded event or shock basisOptional · no recurrence or time-series modeling
Enter one declared event only. Event rate and integrated mass require event flow/concentration pairing; duration is required for integrated mass.
Optional · Available · Extends Wastewater Influent Basis
Wastewater Influent Basis — Acceptance Criteria Extension
Compare project-declared criteria with traceable influent cases. A comparison identifies a declared design or acceptance gap; it does not select a treatment process.
ATLAS compares declared criteria. It does not determine which regulatory, utility, permit, or contractual limit applies to the project.
Comparison basis
Declare each observed case time basis
Sampling method, period, location, source, and point remain in the primary Influent Basis. Select the actual averaging or event context here; ATLAS will not infer it from a label or timestamp.
Declared criteria
Project acceptance criteria
No project criterion is preloaded. Add limits and reference text supplied by the project or owner.
Comparison results
Declared acceptance criteria comparison
A current accepted Influent Basis case is required. Editing the primary basis invalidates these comparison results until its new result is accepted.
Engineering Basis
Methodology
Hydraulic and mass-loading values are calculated from the declared flow and concentration for each paired case, with loads normalized to canonical SI units.
A measured peak load is reported only when flow and concentration are explicitly paired for that case; an average-hold scenario remains an estimate.
Assumptions
- Flow factors and sample metadata are user-declared project inputs.
- Missing data remain missing; the tool does not infer an unpaired concentration or load.
Scope / Limitations
- This basis does not determine compliance, process acceptance, oxygen demand, chemical dose, equalization volume, or downstream equipment size.
Engineering Path
Upstream Context
- Declared influent flow and sample data Enter project flow, concentration, sample basis, and source metadata as declared.
Current Tool Decision
- Wastewater Influent Basis Establish a calculation-ready hydraulic and mass-loading basis while preserving explicit case pairing.
Downstream Engineering Step
- Wastewater Equalization Designer These tools support separate process calculations. Values are not automatically transferred between tools.
- Clarifier Designer These tools support separate process calculations. Values are not automatically transferred between tools.
- BNRMatrix Biological Nutrient Removal These tools support separate process calculations. Values are not automatically transferred between tools.