工程工具 · 水力废水处理

水处理厂水力纵断面设计污水水力剖面与泵送设计器

沿用户定义的管道、泵、固定损失和池体边界分段跟踪水力坡线。

将全厂 HGL 审查扩展至污水渠道、控制结构、流量工况、EGL/TDH 及声明的泵工况校核。

状态
已上线

Project metadata

01 · USER INPUT

Design basis and inputs

Sequential profile segments

Each segment uses only the fields shown for its selected type. Minimum HGL applies at the segment’s downstream station.

Segment 1
Segment 1 Raw water pipe
Segment 2
Segment 2 High-lift pump
Segment 3
Segment 3 Fixed equipment
Engineering calculations run locally in this browser after assets load.

02 · CALCULATED RESULT

Results at a glance

Load or enter inputs, then calculate to display a current result.

03 · REPORTING

Exports

CSV columns remain in canonical SI units (m, m³/s, m²/s) for machine-readable comparison.

此工程工具目前仅提供英文版本。

01

工程依据

方法

根据声明的管道、泵、固定损失和水池边界分段,使用 Darcy–Weisbach 及输入的局部损失构建连续水力坡线。本工具筛选 HGL,忽略速度水头变化,不计算 EGL 或 TDH。

Pipe velocity = Q/A; Reynolds number = vD/ν. Darcy factor uses f = 64/Re for laminar flow and Swamee–Jain for turbulent flow.

Major pipe loss uses Darcy–Weisbach; minor loss is ΣK·v²/(2g).

The sequential profile adds entered pump head and subtracts major, minor, and fixed equipment losses. A basin water surface is an explicit downstream HGL boundary.

Elevation is reported separately; pressure head where elevation is entered is downstream HGL minus elevation.

A segment minimum HGL criterion is evaluated once at its downstream station. The optional starting minimum HGL criterion is evaluated at the starting station.

For 2,000 < Re < 4,000, Swamee–Jain is used as a screening approximation and a transitional-flow warning is reported.

范围 / 限制

  • 根据声明的水力参数计算管道沿程与局部损失、逐段 HGL、压力水头、用户判据和余量。
  • No transient surge, looped network solution, pump selection, system-wide NPSH, or open-channel gradually varied flow.
  • No hydraulic grade is inferred from process-unit names. Basin water surfaces and minimum HGL criteria must be declared.
  • A margin below a user criterion is flagged for review but is not classified as safe or unsafe.
  • This screening HGL profile omits changes in velocity head between segments. It adds entered pump head directly to HGL and does not calculate the total energy grade line or total dynamic head (TDH).
  • Freeboard and available driving head are not calculated. US customary units are a presentation option; calculations and machine-readable CSV values remain in canonical SI units.

方法

将全厂 HGL 审查扩展至污水渠道、控制结构、流量工况、EGL/TDH 及声明的泵工况校核。

02

工程路径

上游背景

  • 全厂工艺配置与设计工况以声明的工艺布置、流量工况和运行假设作为背景;本工具支持全厂设计,不是顺序工艺阶段。

当前工具决策

  • 水处理厂水力纵断面设计沿用户定义的管道、泵、固定损失和池体边界分段跟踪水力坡线。

下游工程步骤

  • 单元工艺与综合项目审查将全厂工具结果与单元工艺设计及项目审查协调;不表示存在第 07 阶段或固定工艺依赖。

工作流

  • 市政饮用水净化将全厂工具结果与单元工艺设计及项目审查协调;不表示存在第 07 阶段或固定工艺依赖。

当前工具决策

  • 污水水力剖面与泵送设计器将全厂 HGL 审查扩展至污水渠道、控制结构、流量工况、EGL/TDH 及声明的泵工况校核。