Skip to main content
Zurück zu Rechner

Ingenieurwerkzeug · Werkzeuge

Hydraulisches Profil einer Wasseraufbereitungsanlage

Verfolgen Sie die hydraulische Gradiente durch eingegebene Rohr-, Pumpen-, Festverlust- und Beckengrenzabschnitte.

Status
Verfügbar
PROJECT · OPTIONAL

Project metadata

Report context for exports; it does not change calculations.Edit detailsHide details

01 · USER INPUT

Design basis and inputs

Sequential profile segments

Each segment uses only the fields shown for its selected type. Minimum HGL applies at the segment’s downstream station.

Segment 1
Segment 1
Segment 2
Segment 2
Segment 3
Segment 3
Engineering calculations run locally in this browser after assets load.

02 · CALCULATED RESULT

Results at a glance

Load or enter inputs, then calculate to create an authoritative result.

03 · REPORTING

Exports and verification

CSV contains input and output detail. PDF uses the current calculation and report metadata.

Verification suite

Calculation revision c8d867d3

65 focused fixtures: Darcy–Weisbach reference fixture, laminar and turbulent factors, minor loss, pump and equipment steps, basin boundary, downstream criteria, optional elevation, and active type-specific input validation. Tests are deterministic and run without network access.

Dieses Engineering-Tool ist derzeit nur in englischer Sprache verfügbar.

01

Ingenieurtechnische Grundlage

Methodik

Erstellt aus deklarierten Rohr-, Pumpen-, festen Verlust- und Beckenwasserspiegelabschnitten ein sequentielles hydraulisches Höhenprofil mit Darcy–Weisbach und eingegebenen Einzelverlusten. Es ist ein HGL-Screening; Änderungen der Geschwindigkeitshöhe fehlen, EGL und TDH werden nicht berechnet.

Pipe velocity = Q/A; Reynolds number = vD/ν. Darcy factor uses f = 64/Re for laminar flow and Swamee–Jain for turbulent flow.

Major pipe loss uses Darcy–Weisbach; minor loss is ΣK·v²/(2g).

The sequential profile adds entered pump head and subtracts major, minor, and fixed equipment losses. A basin water surface is an explicit downstream HGL boundary.

Elevation is reported separately; pressure head where elevation is entered is downstream HGL minus elevation.

A segment minimum HGL criterion is evaluated once at its downstream station. The optional starting minimum HGL criterion is evaluated at the starting station.

For 2,000 < Re < 4,000, Swamee–Jain is used as a screening approximation and a transitional-flow warning is reported.

Umfang / Grenzen

  • Berechnen Sie Rohrreibungs- und Einzelverluste, die sequenzielle HGL, Druckhöhe, Benutzerkriterien und Sicherheitsabstand anhand der deklarierten hydraulischen Eigenschaften.
  • No transient surge, looped network solution, pump selection, system-wide NPSH, or open-channel gradually varied flow.
  • No hydraulic grade is inferred from process-unit names. Basin water surfaces and minimum HGL criteria must be declared.
  • A margin below a user criterion is flagged for review but is not classified as safe or unsafe.
  • This screening HGL profile omits changes in velocity head between segments. It adds entered pump head directly to HGL and does not calculate the total energy grade line or total dynamic head (TDH).
  • Freeboard and available driving head are not calculated. No US-unit conversion path is implemented; hydraulic inputs and outputs use SI units.
02

Ingenieurpfad

Vorgelagerter Kontext

  • Anlagenweite Prozesskonfiguration und Auslegungsfälle Nutzen Sie erklärte Prozessanordnung, Durchflussfälle und Betriebsannahmen als Kontext; dieses Werkzeug unterstützt die Gesamtanlage und ist keine sequenzielle Stufe.

Entscheidung dieses Werkzeugs

  • Hydraulisches Profil einer Wasseraufbereitungsanlage Verfolgen Sie die hydraulische Gradiente durch eingegebene Rohr-, Pumpen-, Festverlust- und Beckengrenzabschnitte.

Nachgelagerter Engineering-Schritt

  • Einzelprozess- und integrierte Projektprüfung Stimmen Sie das anlagenweite Ergebnis mit Einheitsauslegung und Projektprüfung ab; es entsteht weder eine Stufe 07 noch eine feste Prozessabhängigkeit.

Arbeitsablauf

  • Kommunale Trinkwasseraufbereitung Stimmen Sie das anlagenweite Ergebnis mit Einheitsauslegung und Projektprüfung ab; es entsteht weder eine Stufe 07 noch eine feste Prozessabhängigkeit.