Skip to main content
Zurück zu Rechner

Ingenieurwerkzeug · Tanks & Becken

Auslegung von Reinwasserbehältern und Erneuerung des Speicherinhalts

Berechnen Sie Speicherumschlag und abschnittsweisen Verlauf des Reinwasserbehälterinhalts.

Kommunale TrinkwasseraufbereitungStufe 06 — Distribution & Final Quality
Status
Verfügbar
PROJECT · OPTIONAL

Project metadata

Report context for exports; it does not change calculations.Edit detailsHide details

01 · USER INPUT

Design basis and inputs

Storage intervals

Intervals continue from the previous ending inventory.

Hour 1
Hour 1
Hour 2
Hour 2
Hour 3
Hour 3
Hour 4
Hour 4
Engineering calculations run locally in this browser after assets load.

02 · CALCULATED RESULT

Results at a glance

Load or enter inputs, then calculate to create an authoritative result.

03 · REPORTING

Exports and verification

CSV contains input and output detail. PDF uses the current calculation and report metadata.

Verification suite

Calculation revision f3f675ac

63 focused fixtures: turnover fixture, interval row normalization, optional bounds, initial inventory feasibility, trajectory limits, structured results, exports, and stale-result behavior. Tests are deterministic and run without network access.

Dieses Engineering-Tool ist derzeit nur in englischer Sprache verfügbar.

01

Ingenieurtechnische Grundlage

Methodik

Berechnet nutzbares Speichervolumen, nominellen Umschlag und die Bestandskontinuität je Intervall aus deklarierten Zu-/Abflüssen und Zeitdauern. Nomineller Umschlag ist weder tatsächliches Wasseralter noch RTD, T10-Tracer-Kontaktzeit oder Desinfektions-CT; T10 wird nicht berechnet.

Usable storage = gross storage × user-entered usable fraction. Operational storage is separately entered as a declared operating-storage basis and remains a subset of usable storage.

Nominal turnover time = usable storage / average throughput; nominal turnovers/day = average throughput / usable storage.

Interval continuity uses Snext = Scurrent + (Qin − Qout) × duration. When physical limits are enabled, overflow is recorded above the maximum and supply shortfall below the minimum; the modeled endpoint is limited to the applicable bound.

Working storage swing = maximum modeled inventory − minimum modeled inventory, including initial inventory and all modeled interval endpoints.

Umfang / Grenzen

  • Prüfen Sie Nutzvolumen, Umschläge, Verlaufsextreme und Betriebsschwankung. Der unbegrenzte Modus erhält eingegebene Überläufe oder Fehlmengen und weist darauf hin; der begrenzte Modus verfolgt sie ausdrücklich.
  • Nominal turnover is not actual water age, residence-time distribution, T10 tracer contact time, disinfection contact time (CT), or a mixing-performance measure; this tool does not calculate T10.
  • The interval calculation is a storage continuity screen. It does not simulate hydraulics, mixing, or water quality.
02

Ingenieurpfad

Vorgelagerter Kontext

  • Chlor-/Chloramin-CT und Restchlor Stimmen Sie die gewählte Desinfektion mit Speicherung und Endwasserprüfung ab; ein Screening-Ergebnis ist keine regulatorische Gutschrift.
  • UV-Desinfektionsauslegung Stimmen Sie die gewählte Desinfektion mit Speicherung und Endwasserprüfung ab; ein Screening-Ergebnis ist keine regulatorische Gutschrift.

Entscheidung dieses Werkzeugs

  • Auslegung von Reinwasserbehältern und Erneuerung des Speicherinhalts Berechnen Sie Speicherumschlag und abschnittsweisen Verlauf des Reinwasserbehälterinhalts.

Nachgelagerter Engineering-Schritt