산업 폐수 물리화학 전처리 설계 도구

신고된 적정, 약품 주입량, 제거율 및 출처 자료를 바탕으로 산업 폐수 조정·침전 설계 기준을 작성합니다. 약품 수요, 모델링 고형물 및 하류 분리 인계 자료를 구성하며 처리 성능은 예측하지 않습니다.

상태
사용 가능

ENGINEERING WORKBENCH · WASTEWATER STAGE 03

Industrial conditioning and separation-feed basis

Explicit project, laboratory, vendor, and observed inputs. No chemical optimum or treatment performance is inferred.

Manual workflow pathWastewater Preliminary Treatment → Stage 03 physicochemical conditioning → clarifier / vendor separation → Activated Sludge or a selected alternative.Wastewater Preliminary TreatmentActivated SludgeOxyMatrix

01 · FLOW AND PROJECT BASIS

Design flow cases

Cases retain their own time basis; event and peak cases are never annualized.
Average flow provenance
Maximum Day and Peak Hour provenance
Maximum Day Flow provenance · optional
Peak Hour Flow provenance · optional

Bounded event / batch

02 · NEUTRALIZATION BASIS

Chemical demand requires a defined equivalent basis

pH difference alone never calculates reagent demand.
pH observations / target provenance · optional
Neutralization dose provenance

03 · COAGULATION / FLOCCULATION

Use declared test, vendor, or project doses

ATLAS does not infer an optimum dose from TSS, COD, BOD₅, or turbidity.
Coagulation / flocculation dose provenance

Declared mix / flocculation HRT

V = Q × t · no universal HRT is assumed.
Rapid-mix HRT provenance
Flocculation HRT provenance

04 · CHEMICAL PRECIPITATION

Choose explicit reaction or declared dose authority

Stoichiometric reagent availability does not guarantee complete precipitation.
Defined reactionFeCl₃ + PO₄³⁻ → FePO₄(s) + 3 Cl⁻Orthophosphate target is expressed as mg/L as P. Stoichiometry applies only to the declared captured P mass; no equilibrium/speciation or removal prediction.

Optional reaction/contact volume

Declared flow and HRT only.
Reaction/contact HRT provenance · optional

05 · MODELED CONSTITUENT BALANCE

Preserve constituent identity, sample basis and provenance

No default removal percentages; each declared capture is separate from reagent mass.

Enter concentrations in mg/L or mg/L as P as identified. A case requires a paired flow before any mass load is calculated. “No removal declared” is pass-through component accounting only.

Total suspended solidstss · SUSPENDED_SOLIDS
Average Daily Flow
Total suspended solids declared removal provenance
Maximum Day Flow
Total suspended solids declared removal provenance
Peak Hour Flow
Orthophosphate-PorthophosphateP · PRECIPITATION_TARGET
Average Daily Flow
Orthophosphate-P declared removal provenance
Maximum Day Flow
Orthophosphate-P declared removal provenance
Peak Hour Flow
Orthophosphate-P declared removal provenance

06 · CHEMICAL DEMAND

Average, maximum-day, peak-feed, and event quantities

No peak-hour or event annualization.

Chemical feed package by explicit flow case

Flow case / chemicalActive doseActive demandPeak-equivalent basisProduct massProduct volumeBasis
Calculate to populate this result table.

Maximum Day is a design-day quantity. Peak Hour is actual kg/h (and may show separately labelled kg/d-equivalent); Event is kg/event. Average daily use is not annualized without an operating-days basis.

Manual feed package handoff: Chemical Feed & Storage Designer owns storage, day-tank, feed-pump redundancy, and turndown sizing.

07 · MODELED COMPONENT CLOSURE

Declared influent, captured, and remaining liquid mass

Not a whole-plant mass balance; chemical reagent is an added mass term.

MODELED_COMPONENT_CLOSURE

Constituent / caseInfluent massDeclared captured / precipitatedRemaining liquid loadClosure
Calculate to populate this result table.
Stream contractPHYSICOCHEMICAL_INFLUENT → CONDITIONED_WASTEWATER → SEPARATION_FEED. PHYSICOCHEMICAL_EFFLUENT_BASIS is declared/project basis only; this product does not predict effluent quality.

08 · CHEMICAL SOLIDS

Separate captured solids from reaction solids

Wet sludge volume requires declared dry-solids concentration and density.
Optional chemical-solids provenance
Coagulant hydroxide solids ratio provenance · optional
Reagent insolubles ratio provenance · optional
Other chemical solids provenance · optional

Modeled dry solids ledger

Flow caseCaptured influent suspended solidsPrecipitated target constituent · informationalReaction product solidsCoagulant hydroxideReagent insolublesOther declared solidsTotal modeled dry solidsIdentity
Calculate to populate this result table.

PHYSICOCHEMICAL_SLUDGE_BASIS is distinct from PRIMARY_SLUDGE, BIOLOGICAL_WAS, SCREENINGS, and GRIT. Precipitated target mass is informational when included in reaction-product solids.

09 · DOWNSTREAM SEPARATION HANDOFF

Package the declared separation feed

Clarifier and DAF sizing remain outside this product.
Sludge solids concentration provenance · optional
Sludge density provenance · optional

10 · DETAILED RESULTS

Review the current result package

Calculated values remain separated from their declared or reference-supported bases.

Mix / reaction volume basis

Process zoneFlow caseDeclared HRTCalculated volumeProvenance
Calculate to populate this result table.

Flow-case calculation summary

Flow caseHydraulic basisChemical quantity basisModeled dry solidsState
Calculate to populate this result table.

이 엔지니어링 도구는 현재 영어로만 제공됩니다.

01

엔지니어링 근거

방법론

신고된 적정, 약품 주입량, 제거율 및 출처 자료를 바탕으로 산업 폐수 조정·침전 설계 기준을 작성합니다. 약품 수요, 모델링 고형물 및 하류 분리 인계 자료를 구성하며 처리 성능은 예측하지 않습니다.

가정

  • 명시된 중화 방법, 신고된 응집/플록 형성 주입량 및 체류시간, 제한된 FeCl₃/오르토인산-P 화학양론 사례 또는 신고된 약품 질량비, 성분 폐쇄, 화학 고형물, 침전지 또는 프로젝트 분리 시스템으로의 수동 인계를 지원합니다. 최적 주입량, 화학종, 제거 성능, 독성, 생분해성, 규정 준수, DAF 치수 및 약품 저장/공급 장비는 예측하거나 설계하지 않습니다.

범위 / 제한사항

  • 명시된 중화 방법, 신고된 응집/플록 형성 주입량 및 체류시간, 제한된 FeCl₃/오르토인산-P 화학양론 사례 또는 신고된 약품 질량비, 성분 폐쇄, 화학 고형물, 침전지 또는 프로젝트 분리 시스템으로의 수동 인계를 지원합니다. 최적 주입량, 화학종, 제거 성능, 독성, 생분해성, 규정 준수, DAF 치수 및 약품 저장/공급 장비는 예측하거나 설계하지 않습니다.
02

엔지니어링 경로

상류 맥락

  • 폐수 유입수 설계 기준 신고된 적정, 약품 주입량, 제거율 및 출처 자료를 바탕으로 산업 폐수 조정·침전 설계 기준을 작성합니다. 약품 수요, 모델링 고형물 및 하류 분리 인계 자료를 구성하며 처리 성능은 예측하지 않습니다.
  • 폐수 전처리 설계 도구 신고된 적정, 약품 주입량, 제거율 및 출처 자료를 바탕으로 산업 폐수 조정·침전 설계 기준을 작성합니다. 약품 수요, 모델링 고형물 및 하류 분리 인계 자료를 구성하며 처리 성능은 예측하지 않습니다.

현재 도구의 설계 결정

  • 산업 폐수 물리화학 전처리 설계 도구 신고된 적정, 약품 주입량, 제거율 및 출처 자료를 바탕으로 산업 폐수 조정·침전 설계 기준을 작성합니다. 약품 수요, 모델링 고형물 및 하류 분리 인계 자료를 구성하며 처리 성능은 예측하지 않습니다.

하류 엔지니어링 단계

  • 침전지 설계 명시된 중화 방법, 신고된 응집/플록 형성 주입량 및 체류시간, 제한된 FeCl₃/오르토인산-P 화학양론 사례 또는 신고된 약품 질량비, 성분 폐쇄, 화학 고형물, 침전지 또는 프로젝트 분리 시스템으로의 수동 인계를 지원합니다. 최적 주입량, 화학종, 제거 성능, 독성, 생분해성, 규정 준수, DAF 치수 및 약품 저장/공급 장비는 예측하거나 설계하지 않습니다.
  • 활성슬러지 설계 도구 신고된 적정, 약품 주입량, 제거율 및 출처 자료를 바탕으로 산업 폐수 조정·침전 설계 기준을 작성합니다. 약품 수요, 모델링 고형물 및 하류 분리 인계 자료를 구성하며 처리 성능은 예측하지 않습니다.