Skip to main content
Voltar para Ferramentas

Ferramenta de engenharia · Tanques e Bacias

Projeto do reservatório de água tratada e tempo de renovação da água armazenada

Calcule a renovação do armazenamento e a trajetória do inventário do reservatório de água tratada por intervalo.

Purificação municipal de água potávelEtapa 06 — Distribution & Final Quality
Status
Disponível
PROJECT · OPTIONAL

Project metadata

Report context for exports; it does not change calculations.Edit detailsHide details

01 · USER INPUT

Design basis and inputs

Storage intervals

Intervals continue from the previous ending inventory.

Hour 1
Hour 1
Hour 2
Hour 2
Hour 3
Hour 3
Hour 4
Hour 4
Engineering calculations run locally in this browser after assets load.

02 · CALCULATED RESULT

Results at a glance

Load or enter inputs, then calculate to create an authoritative result.

03 · REPORTING

Exports and verification

CSV contains input and output detail. PDF uses the current calculation and report metadata.

Verification suite

Calculation revision f3f675ac

63 focused fixtures: turnover fixture, interval row normalization, optional bounds, initial inventory feasibility, trajectory limits, structured results, exports, and stale-result behavior. Tests are deterministic and run without network access.

Esta ferramenta de engenharia está disponível atualmente apenas em inglês.

01

Base de engenharia

Metodologia

Calcula armazenamento utilizável, giro nominal e continuidade do inventário por intervalo com entradas, saídas e durações declaradas. Giro nominal não é idade real da água, RTD, tempo de contato com traçador T10 ou CT de desinfecção; esta ferramenta não calcula T10.

Usable storage = gross storage × user-entered usable fraction. Operational storage is separately entered as a declared operating-storage basis and remains a subset of usable storage.

Nominal turnover time = usable storage / average throughput; nominal turnovers/day = average throughput / usable storage.

Interval continuity uses Snext = Scurrent + (Qin − Qout) × duration. When physical limits are enabled, overflow is recorded above the maximum and supply shortfall below the minimum; the modeled endpoint is limited to the applicable bound.

Working storage swing = maximum modeled inventory − minimum modeled inventory, including initial inventory and all modeled interval endpoints.

Escopo / Limitações

  • Revise o volume útil, as renovações, os extremos da trajetória e a oscilação operacional. O modo sem limites preserva e sinaliza transbordamentos ou déficits informados; o modo limitado os acompanha explicitamente.
  • Nominal turnover is not actual water age, residence-time distribution, T10 tracer contact time, disinfection contact time (CT), or a mixing-performance measure; this tool does not calculate T10.
  • The interval calculation is a storage continuity screen. It does not simulate hydraulics, mixing, or water quality.
02

Caminho de engenharia

Contexto a montante

  • CT e residual de cloro/cloraminas Coordene a desinfecção selecionada com armazenamento e qualidade final; um resultado de triagem não é crédito regulatório.
  • Projeto de desinfecção UV Coordene a desinfecção selecionada com armazenamento e qualidade final; um resultado de triagem não é crédito regulatório.

Decisão desta ferramenta

  • Projeto do reservatório de água tratada e tempo de renovação da água armazenada Calcule a renovação do armazenamento e a trajetória do inventário do reservatório de água tratada por intervalo.

Próxima etapa de engenharia